Logbook June 7, 2015

0607

Ironworks’s president got ready to perform a visit, lower shelf work at 09:30.

I carried out lower shelf work for from 10:00 to 10:35 and, during lower shelf work, painted uneven coatings.

A captain taught usage of Malin VHF to crew at 10:40.

I departed from Ironworks for a marina for from 10:45 to 11:30.

The owner of the ship visited the marina at 12:10.

By a rope and a mooring method to use for mooring for from 12:10 to 14:00, I received instruction from the owner of the ship.

Because one of the spring water tanks which there was two 13:30 was empty, I supplied spring water and filled up all two of them.

I carried out the party in the ship for from 14:00 to 16:00.

I performed the article confirmation in the ship for from 16:10 to 22:00.

I left it than blue Noah at 22:00.

In addition, I fed Li – ion battery than the system electricity of the marina for from 13:30 to 22:00.

 

http://bluenoah.info/?p=482

Leave a Reply

Your email address will not be published. Required fields are marked *